Urban municipal sewage treatment works and sewerage systems

Szeged Wastewater Treatment Plant

Country Hungary
Period 2004-2008
Client Strabag Rt. – Passavant-Roediger GmbH György Márkus
Details

Design services provided

  • Tender, authorisation, construction and commissioning plans

Technical specifications

  • 230,000 lei 60,000 m³/d
  • KOI 30,000 kg/day
  • BOI5 13,800 kg/d
  • LA 15,960 kg/d
  • TKN 2,506 kg/d
  • Ptot 498 kg/d

Technical specifications

  • Activated sludge biological wastewater treatment with nutrient removal, anaerobic sludge treatment, biogas utilisation, ancillary facilities.
  • PRA technology

Main collection point on the Buda side of the Danube

Country Hungary
Period 2010–2011 (in progress)
Client Budapest Sewerage Works Ltd. József Kovácsvölgyi
Details

Design services provided

  • Water rights licensing plans for supplementary development works relating to the main collection point on the Buda side of the Danube – 10 intervention sites

For the commissioning of the Buda main collection plant

Country Hungary
Period 2009-2010
Client Budapest Sewerage Works Ltd.
Details

Design services provided

  • Mechanical refurbishment of the Zsigmond Square pumping station
  • Hydraulic review of the Buda main collector
  • Study on the rainwater pumping station on Hamzsabégi Road

Budapest Central Sewage Treatment Works

Country Hungary
Period 2005-2010
Client Hídépítő Zrt. – Alterra Kft. Alfréd Tátrai Degrémont SA-OTV France István Kemény Budapest City Council
Details

Design services provided

  • Tender drawings; planning permission drawings; construction drawings for building works; classification of ATEX explosion-hazardous areas; fire safety and health and safety tasks; review and approval of main mechanical engineering design plans: 1.633 million Leé; 350/900,000 m³/d; COD = 155,000 kg/d; BOD₅ = 98,000 kg/d; LA = 60,000 kg/d; NH₄-N = 11,000 kg/d; P = 3,000 kg/d; Activated sludge biological treatment with partial nutrient removal, anaerobic sludge treatment, biogas utilisation, full coverage, odour control. Degrémont-OTV technology: architecture, structure, site layout, electrical installations, building services, irrigation, and groundwater-lowering wells with associated machinery. 7 ha built-up area

North Pest Wastewater Treatment Works

Country Hungary
Period 2005-2008/9
Client Passavant-Roediger GmbH – Strabag Rt. Elmar Henzen
Details

Design services provided

  • Tender, authorisation, construction and commissioning plans

Technical specifications

  • Dry matter to be processed: 72 t/d; Biogas volume: 750–1,020 Nm³/h

Technical specifications

  • Anaerobic sludge treatment – two digesters, each with a capacity of 12,000 m³, biogas utilisation, ancillary facilities. PRA technology

Mülheim an der Ruhr Waste Treatment Plant

Country Hungary
Period 2001-2002
Client BHU – MAT (MEG Mülheim SUTCO) Horst Gesell
Details

Design services provided

  • Study plan, general plan

Technical specifications

  • Volume of organic waste: 22,000 t/year Volume of biogas: 2,256 t/year Volume of compost: 8,909 t/year

Technical specifications

  • Treatment and recovery of household organic waste, food waste and product residues using wet digestion. MAT technology

Délpest Sewage Treatment Works – Sludge Treatment

Country Hungary
Period 2000-2001
Client Philipp Müller GmbH – Bridge Construction Ltd. (Budapest Sewerage Works Ltd., József Kovácsvölgyi
Details

Design services provided

  • Tender drawings, construction drawings, commissioning drawings

Technical specifications

  • Sludge treatment, biogas recovery and stormwater pre-treatment at a plant with a capacity of 80,000 m³/d

Technical specifications

  • Sludge thickeners: ø 23 m + 2 × ø 18 m, 3 centrifuges, 24 pumps, a gas engine with an electrical output of 494 kW and a thermal output of 748 kW, a stormwater basin with a capacity of 3,600 m³. Philipp Müller technology

North Pest Sewage Treatment Works, sewage pipeline

Country Hungary
Period 2000-2001
Client Degrémont S.A. István Kemény
Details

Design services provided

  • Master plan, general plan for Degrémont Inc.

Technical specifications

  • Intensive primary sedimentation: Q = 200,000 m³/d, LEÉ = 775,000

Technical specifications

  • Sedipac/Densadeg plant: 4 x ø 15 m, with provision for subsequent coagulation and flocculation, sedimentation chambers, a dredger and a pumping station (16 pumps). Degrémont technology

Délpest Sewage Treatment Works, Sewage Pipeline

Country Hungary
Period 1998-1999
Client Philipp Müller GmbH – Bridge Construction Ltd.
Details

Design services provided

  • Tender drawings, construction drawings, commissioning drawings

Technical specifications

  • Q = 80,000 / 120,000 m³/d LEÉ = 400,000 / 600,000 Removal of C, N and P Activated sludge treatment, supplemented by biological filtration

Technical specifications

  • Preliminary mechanical treatment, 3 biological stages: primary sedimentation tanks, anoxic and aerobic tanks, secondary sedimentation; 10 Biofor-type N-C-P filters and 6 N-C-P filters. Philipp Müller technology

South Pest Wastewater Treatment Works

Country Hungary
Period 2004
Client Budapest Sewerage Works Ltd. József Kovácsvölgyi
Details

Design services provided

  • KIOP grant application, draft water rights authorisation plan, feasibility study plan

Technical specifications

  • Development of anaerobic sludge treatment (mesophilic and thermophilic digestion)

Further references