Regional Water Supply Systems
Duna-kanyar (Danube Bend) Region Water Supply System on the right bank of the Danube
Country | Hungary |
Year | 2000 |
Contractor / Investors |
National Water Authority |
Engineering services |
Study General design |
Technological data |
80 000 inhabitants 40 000 m3/d - Long-distance water supply lines:25 km (DN 200 - 300) - Basin. Overall capacity: 5 000 m3 - 5 pumping plants |
Expansion of MISKOLC-BORSOD Water Supply System
Country | Hungary |
Year | 1998 |
Contractor / Investors |
National Water Authority |
Engineering services |
Preliminary design, General design |
Technological data |
10.000 m3/d - Long-distance water supply lines: 10 km (DN 400) - Pumping plant |
Duna-kanyar (Danube Bend) Region Water Supply System on the left bank of the Danube
Country | Hungary |
Year | 1997 2000 |
Contractor / Investors |
National Water Authority |
Engineering services |
Preliminary design General design Tender documents Final engineering designs On-site supervision |
Technological data |
50.000 inhabitants 25.000 m3/d - Long-distance water supply lines: 15 km (DN 300) - Basin (2 000 m3) - 3 pumping plants |
Expansion of Lake Velence Region Water Supply System
Country | Hungary |
Year | 1992 2002 |
Contractor / Investors |
National Water Authority |
Engineering services |
Preliminary design General design Tender documents |
Technological data |
50.000 inhabitants 12.000 m3/d - Long-distance water supply lines: 15 km (DN 400) - Basin (1 000 m3) - pumping plant |
AKBOU-BÉJAÏA Valley Region Drinking- and Industrial Water Supply System
Country | Algeria |
Year | 1992-1995 |
Contractor / Investors |
AGEP |
Engineering services |
Preliminary design, General design, Tender documents |
Technological data |
700.000 inhabitants 120.000 m3/d - Water treatment plant, capacity: 120.000 m3/d - Long-distance water supply lines: 82 km (DN 1.200 - 300) - Basin: Overall capacity: 67.000 m3 |
TAFNA-ORAN Water Transfer System
Country | Algeria |
Year | 1992 |
Contractor / Investors |
AGEP |
Engineering services |
Report |
Technological data |
250.000 m3/d - Water reservoir - Water treatment plant - Pumping plant - Long-distance water supply line |
Water supply of Mosonmagyaróvár Phase I and II
Country | Hungary |
Year | 1988-1992 |
Contractor / Investors |
Mayor’s Office |
Engineering services |
General design, Final engineering designs |
Technological data |
35.000 inhabitants 20.000 m3/d - Well-borings and large-diameter borings - Pumping plant - Basin of 4.000 m3 - Long-distance water supply lines DN 500 – 7,5 km DN 400 – 6 km |
Balaton Region Recreation Area Water Supply System
Country | Hungary |
Year | 1980-2002 |
Contractor / Investors |
National Water Authority |
Engineering services |
Conception design, Preliminary design, General design, Tender documents, Final engineering designs, On-site supervision |
Technological data |
800.000 inhabitants 150.000 m3/d - Long-distance water supply lines: 250 km (DN 300 – 600) - Basin. Overall capacity: 72.000 m3 - 14 pumping plants (1.000 – 60.000 m3/d) |