Regional Water Supply Systems

Duna-kanyar (Danube Bend) Region Water Supply System on the right bank of the Danube

Country Hungary
Year 2000
Contractor / Investors

National Water Authority

Engineering services

Study

General design

Technological data

80 000 inhabitants 

40 000 m3/d

- Long-distance water supply lines:25 km (DN 200 - 300)

- Basin. Overall capacity: 5 000 m3

- 5 pumping plants

Expansion of MISKOLC-BORSOD Water Supply System

Country Hungary
Year 1998
Contractor / Investors

National Water Authority

Engineering services

Preliminary design,

General design

Technological data

10.000 m3/d

- Long-distance water supply lines: 10 km (DN 400)

- Pumping plant

Duna-kanyar (Danube Bend) Region Water Supply System on the left bank of the Danube

Country Hungary
Year 1997 2000
Contractor / Investors

National Water Authority

Engineering services

Preliminary design 

General design 

Tender documents 

Final engineering designs 

On-site supervision

Technological data

50.000 inhabitants 

25.000 m3/d

- Long-distance water supply lines: 15 km (DN 300)

- Basin (2 000 m3)

- 3 pumping plants

Expansion of Lake Velence Region Water Supply System

Country Hungary
Year 1992 2002
Contractor / Investors

National Water Authority

Engineering services

Preliminary design

General design

Tender documents

Technological data

50.000 inhabitants 

12.000 m3/d

- Long-distance water supply lines: 15 km (DN 400)

- Basin (1 000 m3)

- pumping plant

AKBOU-BÉJAÏA Valley Region Drinking- and Industrial Water Supply System

Country Algeria
Year 1992-1995
Contractor / Investors

AGEP

Engineering services

Preliminary design,

General design, 

Tender documents

Technological data

700.000 inhabitants

120.000 m3/d

- Water treatment plant, capacity: 120.000 m3/d

- Long-distance water supply lines: 82 km (DN 1.200 - 300)

- Basin: Overall capacity: 67.000 m3

TAFNA-ORAN Water Transfer System

Country Algeria
Year 1992
Contractor / Investors

AGEP

Engineering services

Report

Technological data

250.000 m3/d

- Water reservoir

- Water treatment plant 

- Pumping plant

- Long-distance water supply line

Water supply of Mosonmagyaróvár Phase I and II

Country Hungary
Year 1988-1992
Contractor / Investors

Mayor’s Office

Engineering services

General design,

Final engineering designs

Technological data

35.000 inhabitants 

20.000 m3/d

- Well-borings and large-diameter borings

- Pumping plant

- Basin of 4.000 m3

- Long-distance water supply lines

    DN 500 – 7,5 km

    DN 400 – 6 km

Balaton Region Recreation Area Water Supply System

Country Hungary
Year 1980-2002
Contractor / Investors

National Water Authority

Engineering services

Conception design, 

Preliminary design, 

General design, 

Tender documents, 

Final engineering designs, 

On-site supervision

Technological data

800.000 inhabitants 

150.000 m3/d

- Long-distance water supply lines: 250 km (DN 300 – 600)

- Basin. Overall capacity: 72.000 m3

- 14 pumping plants (1.000 – 60.000 m3/d)