Large Wastewater Treatment Plants - Sewerage Systems
Buda main collector
Country | Hungary |
Year | 2010-2011 |
Contractor / Investors |
Budapest Sewage Works Pte Ltd |
Engineering services |
WULA - design for upgrading of BMC based on the commissioning procedure and trial run |
Buda main collector commissioning
Country | Magyarország |
Year | 2009-2010 |
Contractor / Investors |
Budapest Sewage Works Pte Ltd |
Engineering services |
Upgrading of Zsigmond square pumping station; BMC hydraulic supervision; Hamzsabégi street rain water pumping station study |
Budapest CWWTP
Country | Magyarország |
Year | 2005-2010 |
Contractor / Investors |
Hídépítő-Alterra-Degrémont-OTV (Municipality of Budapest) |
Engineering services |
Bid and permit designs Civil works design Atex design; control of mechanical guide drawing |
Technological data |
1,633 million PE; 350/900.000 m3 BOD5 98.000 kg/d; TSS 60.000 kg/d; NH4-N 11.000 kg/d; P 3.000 kg/d |
Technical characteristics |
Biological treatment with activated sludge system, partially nutrients removal, anaerobic sludge digestion, biogas utilisation, totally covered plant, and odour control. Degrémont-OTV process. Architecture, structure, services, utilities, electrical installation, building services. 7 ha built surface. |
WWTP of Budapest North
Country | Hungary |
Year | 2005-2009 |
Contractor / Investors |
Passavant-Roediger GmbH - Strabag Co. (Budapest Sewage Works Pte Ltd) |
Engineering services |
Bid, permit and detail designs, commissioning |
Technological data |
TSS 72 t/d Biogas 750-1.020 Nm3/h |
Technical characteristics |
Anaerobic sludge digestion - 2x12.000 m3 digesters; biogas utilisation, utilities, services. PRA process |
WWTP of Szeged
Country | Hungary |
Year | 2004-2008 |
Contractor / Investors |
Strabag Co. Passavant - Roediger Ltd (Municipality of Szeged) |
Engineering services |
Bid, permit and detail designs, commissioning |
Technological data |
230.000 PE 60.000 m3/d COD 30.000 kg/d BOD 13.800 kg/d TSS 15.960 kg/d TKN 2.506 kg/d P 498 kg/d |
Technical characteristics |
Primary sed tank: 2x 4x10x25= m3 Biological plant (anaerobic, anoxic, and aerobic tanks): 3 lines = 31.103 m3 Final sed. tank: 8x 10x54x4,6=19.872 m3 Digesters 2x4000 m3 Sludge thickening and dewatering |
Waste Treatment plant in the town of Mülheim an der Ruhr
Country | Magyarország |
Year | 2001-2002 |
Contractor / Investors |
MEG Mülheim SUTCO BHU – MAT |
Engineering services |
Preliminary design, General design |
Technological data |
Organic waste v. 22.000 t/a Biogas v. 2.256 t/a Compost v. 8.909 t/a Cap. of gas engines 2x373 kW |
Technical characteristics |
Household organic waste, food waste, and production residues handling utilize plant. In co-operation with BHU – MAT München |
Budapest-South Wastewater Treatment Plant, Treatment of Sludge
Country | Magyarország |
Year | 2000-2001 |
Contractor / Investors |
Budapest Sewage Works Pte Ltd |
Engineering services |
Bid, permit, detail designs, commissioning |
Technological data |
Treatment of sludge for 80.000 m3/d capacity of the plant, Utilisation of bio-gases Pre-treatment of the storm-water
|
Technical characteristics |
Sludge thickeners: ø 23 m + 2x18 m, 3 centrifuges, 24 pumps, gas engine with 494 kW electric and 748 kW thermal output, Primary clarification basin with 3 600 m3 storm-water capacity in co-operation with PHILIPP MÜLLER GmbH, Stuttgart |
Budapest-North Wastewater Treatment Plant, Waste Water Line
Country | Hungary |
Year | 2000-2001 |
Contractor / Investors |
Budapest Sewage Works Pte Ltd |
Engineering services |
Bid, permit, detail designs, commissioning |
Technological data |
Intensive primary clarification 200.000 m3/d 775.000 PE
|
Technical characteristics |
Sedipac/Densadeg structure: 4 x ø15 m, complete with coagulation, flocculation and settling chambers plus scraper; pump house (16 pumps). In co-operation with DEGRÉMONT, Paris |
Budapest-South Wastewater Treatment Plant, Waste Water Line
Country | Hungary |
Year | 1998-1999 |
Contractor / Investors |
Budapest Sewage Works Pte Ltd |
Engineering services |
Bid, permit, detail designs, commissioning |
Technological data |
Treatment of waste water by activation of the sludge plus biologic filtration Elimination of C, N- and P 80.000 / 100.000 m3/d 400.000/600.000 Population equivalent (PE) |
Technical characteristics |
Mechanical pre-treatment; 3 biologic lines: primary clarification, anoxic, aerobic basins, secondary clarification; 10 filters N-C-P, 6 filters N-C-P, Type: Biofor in co-operation with PHILIPP MÜLLER GmbH, Stuttgart |